1. Before the installation of the machine, the buyer shall arrange for the 1-2 person to be trained for 7 days.
2. 7 days before the installation of the machine, the purchaser shall construct or purchase the water, electricity, gas and machine base according to the drawing.
3. 7 days before the installation of the machine, the buyer shall prepare 3000 sanding templates(plywood).
4. 7 days before the installation of the machine, the buyer shall purchase one water storage tank (1 ton) by himself.
5. The buyer shall purchase 3-5 tons of pp plastic green film.
6. 7 days before mechanical installation, the buyer shall purchase 30 tons of recycled pp plastic particles.
7. 7 days before mechanical installation, the buyer shall purchase a particle dryer.
8. 7 days before mechanical installation, the buyer shall purchase one granule grinder.